103m-Ferris-Wheel
🎡 Technical Parameters (Ferris Wheel)
Total height: 103 m
Rotation diameter: 101 m
Wheel diameter: 97.7 m
Operating height: 101 m
Number of cabins: 48
Capacity per cabin: 6 persons
Total capacity: 288 persons
Round-trip time: 22 min/rev
Peripheral speed: ≈ 0.22 m/s
Drive power: 48 kW
Air-conditioning power: 2.5 kW × 48 = 120 kW
Installed capacity: 227 kVA
Equipment class: A
Equipment type: Observation wheel with main shaft
Equipment code: 01-D101V14.4H101.1
Service mode: Stationary
Design service life: 25 years
Occupied area (equipment projection): 40 m × 103 m
Foundation footprint: 40 m × 52 m
Power supply: 3N+PE 380 V / 220 V 50 Hz
Rotation diameter: 101 m
Wheel diameter: 97.7 m
Operating height: 101 m
Number of cabins: 48
Capacity per cabin: 6 persons
Total capacity: 288 persons
Round-trip time: 22 min/rev
Peripheral speed: ≈ 0.22 m/s
Drive power: 48 kW
Air-conditioning power: 2.5 kW × 48 = 120 kW
Installed capacity: 227 kVA
Equipment class: A
Equipment type: Observation wheel with main shaft
Equipment code: 01-D101V14.4H101.1
Service mode: Stationary
Design service life: 25 years
Occupied area (equipment projection): 40 m × 103 m
Foundation footprint: 40 m × 52 m
Power supply: 3N+PE 380 V / 220 V 50 Hz
🎡 Detailed Specifications
Equipment category: Observation wheel
Equipment level: Class A
Equipment form: Main-shaft Ferris wheel
Drive system power: 48 kW
HVAC system power: 120 kW (2.5 kW per cabin)
Total installed capacity: 227 kVA
Rotation speed: ≈ 0.22 m/s peripheral velocity
Structural design life: 25 years
Ground projection: 40 m × 103 m
Foundation dimensions: 40 m × 52 m
Power requirement: 3-phase 5-wire 380 V / 220 V 50 Hz
Equipment level: Class A
Equipment form: Main-shaft Ferris wheel
Drive system power: 48 kW
HVAC system power: 120 kW (2.5 kW per cabin)
Total installed capacity: 227 kVA
Rotation speed: ≈ 0.22 m/s peripheral velocity
Structural design life: 25 years
Ground projection: 40 m × 103 m
Foundation dimensions: 40 m × 52 m
Power requirement: 3-phase 5-wire 380 V / 220 V 50 Hz
🎡 Production & Installation
Production lead time: To be scheduled
Installation period: To be scheduled
Shipping volume: To be evaluated based on site access
Installation period: To be scheduled
Shipping volume: To be evaluated based on site access
评价
目前还没有评价